Editing the Replenishment Lead Time

Prerequisite

Transport management administrator role

Procedure

  1. Call up the Material flow data > Replenishment lead times menu.
  2. Edit replenishment lead time with mdm_edit_icon.

    Wiederbeschaffungszeit_bearbeiten

    The fields Source system, Material number, Load unit type, Start and Target can be used as filters. If a transport order meets the filter criteria, the Replenishment lead time for this transport order is automatically entered. If no filter criteria are defined, the input Replenishment lead time applies to all transport orders.

  3. Select the material number from the Material number drop-down list.
  4. Select the unit load type from the Unit load type drop-down list.
  5. Select Source location:

    Select the hall, station and storage location where the replenishment lead time is to start from the drop-down lists.

  6. Select the Target location:

    Select the hall, station and storage location where the replenishment lead time is to end from the drop-down lists.

  7. Enter a Description.
  8. Adjust replenishment lead time.

    Example of a defined replenishment lead time: For all materials that come from hall 1, station warehouse 1, storage location 1 and are to be delivered to hall 2, station warehouse 2, storage location 2, a replenishment lead time of 5 hours should apply. In this example, the filter criteria are Source and Target.

    The replenishment lead time of 5 hours applies to all transport orders that fulfill the filter criteria (start, target).

  9. Confirm the settings with Save.

The replenishment time is used for all transport orders with the set filter criteria.