Element/icon |
Description |
---|---|
Shift type* |
Choice of early, late, night shift (standard shift types) |
Shift start/end* |
Shift start and shift end |
Shift duration |
Shift duration Shift can be a maximum of 24 hours and must not exceed the start of the working day. |
Series |
This option adds some input fields to the dialog. Further information: Add Shift Series Dialog |
Planned number of parts |
Planned number of parts to be produced |
Plan Workers |
Optional input for planned labor |
Utilization factor |
Percentage utilization of a shift (optional, default: 100%) |
Number of Direct Workers |
Number of direct workers (integer); this affects productivity and, where applicable, the target cycle time (if this is dependent on the number of workers) |
Number of Indirect Workers |
Number of indirect workers (floating-point value), e.g. if a worker is assigned to a line proportionately. Only affects productivity) |
Additional information |
Notes |
The Shift Book Admin operator can deactivate the entry of planned/additional workers and the utilization factor under Shopfloor > Administration > Configuration using the configuration parameters Enable "Planned workers" and Enable "Additional workers" and "Enable shift utilization" on a global or line-specific basis. In this case, the input fields are not visible.
The following conditions must be complied with:
- Shifts must not overlap.
- A shift type may only be used once on a production day.
- The start of the production day (e.g. 6 o'clock) must not be within a shift.