Manually Changing the Status of Transport Movements

Transport movements can be completed with a defined result.

Prerequisite

Role Transport Management Administrator or Transport Management Logistik Planer

With the role Transport Management Logistik Planer the status of the transport movements can only be set to Completed (delivered) or Plannable.

Procedure

  1. Open the Material flow > Transport movements menu.
  2. To manually change the status of a transport movement, use mdm_edit_icon to open the Change status of transport movements dialog window in the line containing the required transport movement.

    Transportbewegung_abschliessen_02

    The status of the transport movement has changed and is displayed in the table.

    In the line containing the transport movement, can be used to set the status to Completed (delivered).

  3. To change the status of multiple transport movements manually, activate the checkboxes of the required transport movements.
  4. In the header, use mdm_edit_icon to open the Change status of transport movements dialog window.

    In the header, the status of the selected transport movements can be set to Completed (delivered) using .

The status of the transport movements has changed and is displayed in the table.