The Accumulated Part Count report shows an overview of the part count produced on a production day. Shifts, types and downtimes are taken into account.
Legend
Click on the elements in the legend to show or hide them. Hidden elements are grayed out in the legend and the preceding icon is rotated.
Element |
Description |
---|---|
Part Count |
Produced part counts |
Target Value (OEE 100%) |
Part counts to be achieved based on 100% OEE |
Target Value |
Part counts to be achieved based on the target OEE |
Lower Limit |
Lower validity range of the setpoint |
Technical |
Availability losses, for example due to a mechanical fault |
Organizational |
Availability losses, for example due to lack of workers |
Changeover |
Availability losses, for example due to changeover processes |
Quality |
Availability losses, for example due to defective additional components |
Diagram options
Element |
Description |
---|---|
Display downtime markings |
Projects the downtimes displayed in the third line of the graphic into the accumulated part count view. |
Downtime Category |
Selection of the downtime category: Technical, organizational, changeover-related and quality |
Downtime Type |
Selection of the downtime types: Planned and unplanned, only planned, or only unplanned |