Accumulated Part Count

The Accumulated Part Count report shows an overview of the part count produced on a production day. Shifts, types and downtimes are taken into account.

Legend

Click on the elements in the legend to show or hide them. Hidden elements are grayed out in the legend and the preceding icon is rotated.

Element

Description

Part Count

Produced part counts

Target Value (OEE 100%)

Part counts to be achieved based on 100% OEE

Target Value

Part counts to be achieved based on the target OEE

Lower Limit

Lower validity range of the setpoint

Technical

Availability losses, for example due to a mechanical fault

Organizational

Availability losses, for example due to lack of workers

Changeover

Availability losses, for example due to changeover processes

Quality

Availability losses, for example due to defective additional components

Diagram options

Element

Description

Display downtime markings

Projects the downtimes displayed in the third line of the graphic into the accumulated part count view.

Downtime Category

Selection of the downtime category: Technical, organizational, changeover-related and quality

Downtime Type

Selection of the downtime types: Planned and unplanned, only planned, or only unplanned