Managing a stand-alone facility

Prerequisites

Procedure

  1. Select a functional unit (Fu), working position (Wp) or tool position (Tp) in the facility tree.
  2. To define a facility as stand-alone without a predecessor and successor, activate Stand-Alone Facility Without Predecessors/Successors).
  3. Click Save.

Your changes have been saved.