Cycle Times

The Cycle Times report shows the median cycle times over time, over facilities or as a Pareto chart for the selected time range. In this way, the facility with the longest cycle time can be determined.

Legend

Click on the elements in the legend to show or hide them. Hidden elements are grayed out in the legend and the preceding icon is rotated.

Element

Description

Median Cycle Time

Median of the cycle time

Quartiles (lower 25%, upper 75%)

Shows the quartiles at 25% and 75% as black horizontal bars, connected by a vertical gray line

Target Value

Target cycle times to be achieved

Intervention Limits

Validity range for the setpoint. Action is required if the upper intervention limit is exceeded or the lower intervention limit is undershot. If this is the case for the selected past period or facility, is displayed for this period or facility.

Diagram options

Element

Description

Split Days Into Shifts

When activated, displays the cycle times per shift

Only when selecting the grouping By time, only when grouping by day (e.g. one month as the time range).

Display

Selection between the topological chart and the Pareto chart

Only when selecting the By facility grouping.

Pareto Display

Select between sorting by median cycle time and interquartile distance

Only when selecting the By facility grouping, and only when the Pareto chart is displayed.