When a reservation is made, the required material is reserved at various storage locations, for example in a climate chamber located on a production line.
The reservation status indicates the progress of the processing. For each status, there is a separate table column in the Material Orders (All Lines) window. The following table describes all statuses of a reservation:
Status |
Description |
Created by |
The material calculation has made the reservation based on the material requirements and the appropriate material at a configured storage location. A reservation is only created if the required material is neither on the machine nor in delivery and cannot be obtained from an existing reservation or request. If there are more than the required materials per material number, the material is selected according to the Admin Settings under Parameter Type: Line > Group: SRS > Material Reservation Algorithm. |
In delivery |
Material has been booked out of the storage location and is out for delivery. |
Delivered |
The material that was in delivery has been checked in at the handover location specified in the reservation. |
Canceled |
The material requirement estimated by the material calculation has changed and the reservation is no longer required. |
Time exceeded |
The amount of time for reserved material under Parameter Type: Line > Group: SRS > Material Reservation Duration [Minutes] has been exceeded. Or: The amount of time for reserved material in delivery in Parameter Type: Line > Group: SRS > "In Delivery" Material Reservation Duration [minutes] has been exceeded. The material calculation has created an emergency order (request) for the material. |
Missing |
The material has been checked in at a location that is not specified in the reservation. The material calculation is now looking for another way to obtain the material. Other options depend on the Admin Setting Parameter type: Line > Group: SRS > Material Reservation Duration [Minutes]. |