Change the release status of the line

Prerequisites

Procedure

  1. Click in the Production Area & Product Family search box in the Editor tab.
  2. In the Production Area drop-down list, select a production area by activating the checkbox and click .
  3. In the Product Family drop-down list, select a product family by activating the checkbox.
  4. Click on a variant in the list.
  5. In the detailed view, call up the Line Release tab.
  6. Change the status in the Line Release Status drop-down list in the row of the line.
  7. Enter a version comment in the Change Line Release Status dialog window.

    setsp_change_status_line

  8. Click Save.

The release status of the line is changed.