Edit downtime

Prerequisites

Procedure

  1. Double-click the downtime.

    Or:

    Click the downtime and then click mdm_edit_icon.

    The Edit downtime dialog opens. The content corresponds to the Add downtime dialog.

    Adding Downtime Dialog, 4M downtime action dialog, Add downtime series dialog

  2. Make changes.
  3. Click Save.

The downtime is changed.

Planned downtimes that are postponed or extended at short notice become unplanned downtimes.