Prerequisites
Procedure
Or:
Click the downtime and then click .
The Edit downtime dialog opens. The content corresponds to the Add downtime dialog.
Adding Downtime Dialog, 4M downtime action dialog, Add downtime series dialog
The downtime is changed.
Planned downtimes that are postponed or extended at short notice become unplanned downtimes.