Prerequisites
Procedure
Or:
Click the downtime series, then click .
The Open downtime series dialog opens.
The Edit downtime dialog opens. The content corresponds to the Add downtime dialog.
Adding Downtime Dialog, 4M downtime action dialog, Add downtime series dialog
The downtime series is changed. A modified individual downtime of a downtime series is marked with .
Individual downtimes marked with still respond to changes to the downtime series (e.g. change to the start time). In the event of changes, the triggered downtimes are removed and recreated in accordance with the downtime series.