During this step, material must be loaded at the current station.
Depending on the configuration, either the Material description or the Transport order numbercolumn (display of the transport order numbers as bar codes) is displayed.
The individual materials that need to be loaded are displayed in a table.
To report complications while loading the materials, continue with Reporting a Problem.
If a transport order is to be rejected or scheduled later, change the status of the transport order with .
Load: The material is loaded according to plan.
Cancel: The material is rejected and not loaded. It remains at the station.
Schedule later: The material is not loaded and is to be loaded and transported to the destination on the next possible tour. The rescheduling is carried out automatically by Nexeed Transport Management.
After loading the materials, continue the tour with Loaded.
The tour will continue and the next step will appear.