The Target cycle times tab is used to create, check and modify target cycle times with optional process dependency. Target cycle times are always assigned per type group and type (Type groups and types tab) or per process number.
Prerequisites
Procedure
In the menu of the web portal, click Shopfloor management > Administration > Target cycle times tab.
The Target cycle times tab opens.
The Target cycle times tab displays a table of type groups and their target cycle times, as well as interaction elements (Description of the interaction elements for target cycle times).