The following types of downtimes exist:
As soon as the current time + offset (configurable in Shopfloor Management Administration) reaches the start of a downtime belonging to a downtime series, it is automatically transformed into a regular, individual downtime. It is no longer part of the (downtime) series, i.e. changes to the series no longer affect it. It can be edited in the calendar overview.